期刊文献+

基于状态集分解的一类车间计划、调度算法 被引量:2

Integration of Planning and Scheduling Problem Based on States Decomposition
下载PDF
导出
摘要 针对集成生产计划、调度中的一类强NP-hard问题,提出了基于状态集分解的分层混合优化算法。通过状态集分解将计划、调度一体化模型转化为一系列的最小网络流模型,上层搜索通过建立可行性必要条件和启发式规则,迅速排除劣解或不可行解,缩小搜索范围。底层搜索主要依靠网络流算法及对偶再优化算法,辅以启发式策略,做小范围的局部精确寻优。数据仿真说明了算法的有效性。 A novel hybrid algorithm based on states decomposition with hierarchical search was proposed to address the simultaneously planning and scheduling problem arising in industry which was proven to be strong NP-hard. The problem was first transformed into a series of network flow models by states decomposition. The top level inferior or infeasible solutions were precluded quickly through feasibility checking and problem-specific strategies which greatly reduced the searching area. The network flow algorithm and the dual re-optimization algorithm incorporated with local search methods were employed to resolve the remaining problem at the lower level. The computational experiments demonstrate the efficiency of the proposed algorithm.
出处 《系统仿真学报》 CAS CSCD 北大核心 2009年第8期2314-2320,共7页 Journal of System Simulation
基金 国家自然科学基金资助项目(60574063)
关键词 状态集分解 批量计划调度 网络流模型 分层搜索 states decomposition lot-sizing and scheduling problem network flow model hierarchical search
  • 相关文献

参考文献13

  • 1Drexl A, Kimms A. Lot sizing and scheduling-survey and extensions [J]. European Journal of Operational Research (S0377- 2217), 1997, 99(1): 221-35.
  • 2Herbert Jodlbauer. An approach for integrated scheduling and lot-sizing [J]. European Journal of Operational Research (S0377- 2217), 2006, 172(3): 386-400.
  • 3Herbert Meyr. Simultaneous lotsizing and scheduling on parallel machines [J]. European Journal of Operational Research (S0377- 2217), 2002, 139(2): 277-292.
  • 4Herbert Meyr. Simultaneous lotsizing and scheduling by combining local search with dual reoptimization [J]. European Journal of Operational Research (S0377-2217), 2000, 120( 12): 311-326.
  • 5Bernhard Fleischmann, Herbert Meyr. The general lotsizing and scheduling problem [C]//OR Spektrum (S0170-6012), 1997, 19(15): 11-21.
  • 6Tang L, Liu J, Rong A, Yang Z. A review of planning and scheduling systems and methods for integrated steel production [J]. European Journal of Operational Research (S0377-2217), 2001, 133(12): 1-20.
  • 7Marc Gravel, Wilson L, Price B, Caroline Gagn. Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic [J]. European Journal of Operational Research (S0377-2217), 2002, 143(13): 218-229.
  • 8Freeman N Kelly, J D Zhang, W Mann J L. Scheduling optimization for aluminum smelter cast houses [R]// Light Metals, Warrendale Proceeding 2005. Sendiago: Springer, 2005: 0843-848.
  • 9Silvio A de Araujoa, Marcos N Arenalesb, Alistair R Clarke. Lot sizing and furnace scheduling in small foundries, Computers & Operations Research, 2008, 173(1): 1-15.
  • 10Elisangela dos Santos-Meza, Maristela Oliveira dos Santos, Marcos Nereu Arenales. A lot-sizing problem in an automated foundry. [J]. European Journal of Operational Research (S0377-2217), 2002, 139(1): 490-500.

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部