摘要
介绍墟沟港区一期工程港外生活区工程灌注桩施工中采取了有效措施,对原材料及各施工工序进行了严格的控制,保证了灌注桩的施工质量。
Abstract During concrete pile construction of the living quarter otside the port area of Xugou lst phase project,effective measures were taken and the quality of raw materials and construction procedures were strictly controled.so that the construction quality of concrete pile were ensured.
出处
《水运工程》
北大核心
1998年第2期37-38,共2页
Port & Waterway Engineering