4Suckling Tony,Conflicting requirements‘firm’pile concrete in secant pile walls[J].Concrete,2005,39(6):26-27.
5Cervia A R D.Construction of the deep cut-off at the Walter F.George dam[C]//Proceedings of Sessions of the Geo-Support Conference:Innovation and Cooperation in Geo,2004:530-544.
6Wong I H,Poh T Y.Comparison of retaining walls for basement construction in stiff clays[J].Tunnelling and Underground Space Technology,1999,14(4):461-468.