建设项目的可建筑性设计及其切入点研究 被引量:2

On Buildability Design and Its Breakthrough Points of Construction Projects
下载PDF
导出
摘要 在我国工程建设中,设计和施工是两项各自独立的工作。随着工程建设制度和社会分工的发展,以及专业化程度的提高,二者之间的交流越来越少,导致施工图纸难以或无法施工,因此,设计的可建筑性研究十分必要。探讨如何在设计阶段开展可建筑性工作,以及影响可建筑性设计的因素。将可建筑性设计的切入点划分为四大类别,并提出了后续研究的路线。 Abstract:In our country's engineering construction, design and construction are mutually independent work. With the development of engineering construction system, social division of labor and raising of specialization degree, the communications between design and construction become more and more scarce. This situation causes construction blueprints hard to be implemented. Thus, it is necessary to study design' s buildability, but how to carry out buildability work and define the factors which may affect buildability at the design stage are the issues need us to resolve urgently. Through studying and exploring, breakthrough points of buildability design are divided into four categories, and then subsequent research routes are given.
出处 《重庆交通大学学报(社会科学版)》 2009年第2期31-34,共4页 Journal of Chongqing Jiaotong University:Social Sciences Edition
关键词 建设项目 设计阶段 可建筑性 切入点 design stage buildability breakthrough point
  • 相关文献

参考文献1

共引文献15

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部