苏通大桥索塔施工控制 被引量:4

Construction Control for Tower of Sutong Bridge
原文传递
导出
摘要 苏通大桥超高混凝土索塔的施工控制,是全桥控制的关键所在。建立索塔空间有限元模型,对施工过程进行正装分析,其中考虑了混凝土收缩、徐变和几何非线性。根据计算结果,得到各节段的预拱和超长,以此为根据,对相应节段进行放样并定位模板,达到了较高的施工精度。 Construction control to ultra-high concrete tower of Sutong Bridge is the key point of the construction control to whole bridge. A 3-D FEM model of the tower is built, and considering concrete shrinkage and creep effect and geometry non-linearity, the orderly-erecting analysis to the construction proceeding is carried out. According the results of calculation, pre-camber and ultra-length of each segment could be confirmed. Based on these, lofting and orientation of the moulding board to the corresponding segment could be made. Construction accuracy is high enough finally.
出处 《公路》 北大核心 2009年第3期16-20,共5页 Highway
基金 国家科技支撑计划 项目编号2006BAG04B04
关键词 苏通大桥 索塔 施工 施工控制 预拱 超长 Sutong Bridge tower construction construction control pre-camber ultra-length
  • 相关文献

参考文献2

二级参考文献2

共引文献1735

同被引文献25

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部