摘要
该文以广州开发区西区污水处理厂工艺改造为例,介绍了将传统活性污泥工艺改造为复合生物处理工艺的方法,并通过运行数据的对比,分析了复合生物处理工艺改造的效果和取得的经济、工程效益,同时对改造中的关键问题进行了总结。
Taking the technological renovation of West District Wastewater Treatment Plant of Guangzhou Development Area as an example,the article introduces the method of renovating the traditional activated sludge technology to the compound biological treatment technology.And after the contrast of operation data,the article analyzes the effect,the achieved economical and engineering benefits in the renovation of compound biological treatment technology,and at the same time,sums up the key issues in the renovation.
出处
《城市道桥与防洪》
2009年第4期73-75,共3页
Urban Roads Bridges & Flood Control