期刊文献+

结合三峡水利工程探讨移民工作 被引量:3

Discussion on Emigration Work Combined with Sanxia Water Conservancy Project
下载PDF
导出
摘要 该文介绍了水利水电工程移民具有的四个基本特征,即被动性、时限性、区域性和补偿性;介绍了为了做好移民安置工作,需要正确处理好的几个方面的关系,即移民补偿与移民就业保障的关系、移民安置与生态环境保护的关系、移民迁建与经济社会发展的关系、移民搬迁与教育发展的关系、移民与推进城镇化的关系等。 The article introduces four basic characters,i.e.passivity,time limit,district and compensation of the emigration in the water conservancy and water electricity projects.The article introduces the relationships of the emigration compensation with the emigration employing guarantee,the emigration resettling down with the ecological environmental protection,the emigration removing construction with the economical social development,the emigration removing with the education development,and the emigration with the urbanization advancing required to correctly handle in the settling down work of the emigration.
作者 高庆艳
出处 《城市道桥与防洪》 2009年第4期132-134,共3页 Urban Roads Bridges & Flood Control
关键词 水利水电工程 移民 基本特征 三峡工程 water conservancy and water electricity project emigration basic character Sanxia Project
  • 相关文献

同被引文献9

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部