摘要 分别建立了不考虑和考虑供应商之间配送批量匹配性的生产和配送协同决策模型,采用模拟退火算法(SA)对后者进行求解,结合算例,对两种协同决策模型进行了比较分析。结果表明:考虑供应商之间配送批量匹配性后,供应链系统及供应商单位时间的生产和物流成本显著降低,但Supply Hub运营商与制造厂商的物流成本有所上升。 In order to study the collaborative decision problem about suppliers" distribution lot-sizing in context of Supply Hub, the collaborative decision models between production and distribution for considering and not considering the distribution lot-sizing matching among suppliers were proposed respectively. Simulated Annealing algorithm was presented to solve the collaborative decision model of considering distribution lot-sizing matching. The results were compared with that of model not considering distribution lot-sizing matching. It is shown that the setup cost and logistics cost per unit time in the supply chain and that of suppliers is greatly reduced after considering distribution lot-sizing matching among suppliers, while the per unit time logistics cost of Supply Hub operator and the manufacture is increased.
出处 《工业工程与管理》 北大核心 2009年第2期1-9,共9页 Industrial Engineering and Management
基金 国家高技术研究发展计划(2006AA04Z153) 国家自然科学基金(70672040)
关键词 供应链 集配中心 协同决策 匹配 supply chain supply hub collaborative decision making matching
  • 相关文献

参考文献12

  • 1Barnes E, Dai J,Deng Shijie. On the strategy of supply hubs for cost reduction and responsiveness [R]. singapore: National University of Singapore, 2000.
  • 2龚凤美,马士华.基于Supply Hub的第三方物流直送工位模式研究[J].工业技术经济,2007,26(8):124-127. 被引量:20
  • 3Hahm J,Yano C A. The economic lot and delivery scheduling problem: the single item case[J]. International Journal of Production Economics, 1992,28(2) : 235-252.
  • 4Hahm J, Yano C A. Economic lot and delivery scheduling problem:the common cycle case [J]. IIE Transactions, 1995, 27 ( 2 ) : 113- 125.
  • 5Hahm J, Yano C A. Economic lot and delivery scheduling problem: the nested schedule case[J]. IIE Transactions, 1995, 27(2) : 126-139.
  • 6Khouja M. The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate [J]. IIE Transactions, 2000,32(8) :715-725.
  • 7Clausen J,Ju S. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case [J]. European Journal of Operational Research, 2006,175 ( 2 ) : 1141- 1150.
  • 8Elizabeth F V, Nhouja M, Michalewicz Z. An evolutionary algorithm for optimizing material flow in Supply chains [J]. Computers Industrial Engineering, 2002,43 (3) :407-421.
  • 9Khouja M. Synchronization in supply chains: implications for design and management [J ]. Journal of the Operational Research Society,2003,54(9) :984-994.
  • 10Pundoor G. Integrated production-distribution scheduling in Supply chains[D]. Maryland:University of Maryland, 2005.

二级参考文献10

  • 1王彧,马士华.供应链环境下集配商供应模式的探讨[J].管理评论,2005,17(2):33-36. 被引量:38
  • 2陈建华,马士华.基于集配中心的供应链物流整合方式[J].当代经济管理,2006,28(4):33-37. 被引量:31
  • 3Earl Barnes, Jim Dai, Shijie Deng et al. On the Strategy of Supply Hubs for CostReducfion and Responsiveness. TLI- APWhite Paper On Electronics Supply Chain, Georgia Institute of Technology and National University of Singapore, 2000.
  • 4Zuckerman, A. Compaq Switches to Pre-Position Inventory Model.World Trade, April, 2000: 72-74.
  • 5L.R.Kopczak, Apple Computer's Supplier Hubs: a Take of Three Cities, Stanford University Case, 1996.
  • 6Hau L.Lee, Aligning Supply Chain Strategies with Product Uncertainties.Califomia Management Review Vol.44, No.3 Spring 2002 105-119.
  • 7Circle International's website, http: //www.circl eintl. com/prodserv/vendor hubs. htm.
  • 8Roshan Gaonkar & N.Visvanadham, Collaborative Scheduling Model for Supply Hub Management, 3rdAegean In ternational Conference on Design andAnalysis of Manufacturing Systems, 2001:1-6.
  • 9Janat Shaha, Mark Gohb, Setting Operating Policies for Supply Hubs.International Journal of Production Economics 100 (2006) 239-252.
  • 10Yuliang Yao, Philip T.Evers, Martin E.Dresner. Supply chain integration in vendor- managed inventory. Decision Support Systems 43 (2007) : 663-674.

共引文献19

同被引文献216

引证文献20

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部