摘要
根据《船闸输水系统设计规范》和桂平二线船闸地质条件的具体特点,确定了输水系统型式,计算了输水阀门处廊道断面的面积。在调查分析大量资料基础上,设计了桂平二线船闸输水系统各部位的型式、主要尺寸和闸室消能布置,估计了输水系统的流量型式。水力计算表明:设计的输水系统水力特性满足要求。
According to the Design Code for Filling & Emptying System of Shiplocks Design and in view of the geologic condition of Guiping Second-lane lock,we determined the type of the filling & emptying system and calculated the cross-sectional area of the culvert where the valve locates.Based on the investigation and analysis of a lot of data,we designed the type of each part and main dimensions of the filling & emptying system and the arrangement of the energy dissipating device in the lock chamber.We also estimated the discharge mode of the filling & emptying system.The hydraulic calculation proves that the hydraulic features of the designed filling & emptying system meet the requirement.
出处
《水运工程》
北大核心
2009年第3期109-115,共7页
Port & Waterway Engineering
关键词
桂平二线船闸
输水系统型式
闸室消能布置
Guiping Second-lane lock
type of filling & emptying system
energy dissipating device arrangement in lock chamber