1[1]Volker Coors, Uwe Jasnoch, Voler Jung. Using the virtual table as and interaction platform for collaborative urban planning [J]. Computers & Graphics, 1999, (23): 487~496
2Zhong Denghua, et al. Study on dynamic visual simulation system for complex construction processes [A]. The Sixth International Conference for Young Computer Scientists [C]. Hongzhou, China, 2001, 430 - 434.
3Tamotsu kamigaki, et al. An object-oriented visual model-building and simulation system for FMS control [J]. Simulation, 1996, 67(6): 375-385.
4Fritsch D. Three-dimensional geographic information system: Status and prospects [A]. International Archives of Photogrammetry and Remote Sensing [C]. Vienna: the Committee of the 18th ISPRS, 1996, 18(B3): 215- 221.
5Victor J D. Delaunay triangulation in TIN creations: An overview and a linear time algorithm [J]. International Journal of Geographical Information System, 1993, 7(6) : 501 - 524.
6AbouRizk S M, Mather K. Simplifying simulation modeling through integration with3D CAD [J]. Journal of Construction Engineering and Management, ASCE, 2000, 126(6) : 475 - 483.
6Victor J D. Delannay triangulation in TIN creations: Anoverview and alinear time algorithm[J]. International Journal of Geographical In for marion System, 1993,7(6) :501 -524.