期刊文献+

武开河的边界约束判别准则 被引量:2

Boundary constraint criterion for onset of mechanical ice-cover breakup
下载PDF
导出
摘要 根据封冻河道春季冰盖破裂机理,采用弯曲河道边界约束概念,提出可用于预测武开河发生的判别准则,并对其适用性进行了论证。应用黄河河曲段1985—1994年的原型观测资料对该判别准则进行验证,结果表明该准则可以较好地用于河道武开河的判别。 Based on the mechanism of ice-cover fractures in an ice-covered river, the criterion applied to predict the mechanical ice-cover breakup is presented using the concept of boundary constraints in channel bends. The applicability of this criterion is demonstrated. The prototype observation data from the Hequ Reach of the Yellow River from 1985 to 1994 are used to validate the criterion. The results show that the criterion can appropriately forecast the onset of ice-cover breakup.
出处 《水利水电科技进展》 CSCD 北大核心 2009年第2期1-4,共4页 Advances in Science and Technology of Water Resources
基金 国家自然科学基金(50579030)
关键词 武开河 河冰 判别准则 边界约束 冰盖破裂 冰坝 mechanical ice-cover breakup river ice criterion boundary constraint ice fracture ice dam
  • 相关文献

参考文献9

二级参考文献23

  • 1孙肇初,汪德胜,王肇兴.冰塞厚度分布计算模型的探讨[J].水利学报,1989,21(1):54-60. 被引量:10
  • 2孙肇初,隋觉义.江河冰塞的研究及其意义[J].地球科学进展,1990,5(3):51-54. 被引量:13
  • 3王军,付辉,伊明昆,尹运基,高月霞.冰塞水位分析[J].水科学进展,2007,18(1):102-107. 被引量:14
  • 4茅泽育,董曾南,陈长植.河冰数学模拟研究综述[J].水力发电,1996,23(12):58-61. 被引量:15
  • 5茅泽育,许昕,王爱民,张磊,岳光溪.开河期冰坝预测方法研究进展[J].水利水电科技进展,2007,27(3):76-80. 被引量:10
  • 6程亮 倪汉根.k-ε紊流模型对正交渠道流动的预测能力[Z].,..
  • 7J J McGuirk, W Redi. A Depth-averaged Mathematical Model for Near Field of Side Discharges into Open-channel Flow[J]. Fluid Mech., 1978, 86: 761-781.
  • 8K Hanjalic, B E Launder. Sensitizing the Dissipation Equation to Irrotational Strains[J].Transactions of the ASME,1980, 102 (3): 34-40.
  • 9Wu Rong, Mao Zeyu. Simulation of Channel Combining Flow at 90-Degree Junction[A]. Proceedings of The 5th International Conference on Hydrodynamics[C] Tainan Oct., 2002, 331 - 338.
  • 10Smith T, Ettema R. Flow resistance in ice-covered alluvial channels[J]. Journal of hydraulic engineering, 123(7) : 1997.592 - 599.

共引文献119

同被引文献21

  • 1茅泽育,许昕,王爱民,张磊,岳光溪.开河期冰坝预测方法研究进展[J].水利水电科技进展,2007,27(3):76-80. 被引量:10
  • 2赵雪峰.开河期冰盖体断裂机理及开河判别准则研究[D].北京:清华大学,2008.
  • 3BELTAOS S.Threshold between mechanical and thermal breakup of river ice cover[J].Cold Regions Science and Technology,2006,40:183-196.
  • 4ASHTON G D.River and lake engineering[M].Littleton,Colorado:Water Resources Publications,1986.
  • 5山西省河曲县防汛抗旱指挥部.黄河河曲冰塞观测资料汇编[R].河曲市:山西省河曲市轻印刷服务中心,1993.
  • 6ASHTON G D. River and lake engineering [ M].Littleton, Colorado, USA: Water Resources Publications,1986.
  • 7BELTAOS S. River ice jams [ M]. Highlands Ranch,Colorado, USA : Water Resources Publications, 1995.
  • 8ZUFELT J E, ETTEMA R. Fully coupled model of ice-jamdynamics [J]. Journal of Cold Regions Engineering,2000,14(1) :2441.
  • 9SHE Y. Numerical and field studies of river ice jamdynamics [ D]. Edmonton,Alberta, Canada : University ofAlberta,2008.
  • 10SHEN H T’GAO L’KOLERSKI T. Dynamics of ice jamformation. [ C]//Proc. of 19th IAHR Ice Symposium.Vancouver’Canada: [ s. n.] ,2008 :317-326.

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部