摘要 南京大胜关长江大桥6~8号主墩基础采用超大型钢吊(套)箱围堰施工。在水文地质条件复杂的潮汐河段,钢吊(套)箱采用气囊法下水、浮运就位,无导向船重锚精确定位,围堰挂桩,内支撑桁架兼作钻孔平台,接高围堰,在重力大于浮力的可控状态下,实现围堰整体下放着床及河床内下沉第2次定位挂桩等施工方案。着重介绍超大型钢围堰气囊法断缆整体下水技术,钢吊箱无导向船重锚精确定位技术,超大型钢吊(套)箱下放、着床、下沉控制技术等基础施工关键技术。 The foundations of main piers No. 6 - No. 8 of Dashengguan Changjiang River Bridge in Nanjing were constructed by the very huge steel boxed cofferdams. In the tidal river reach of complicated hydrologic and geologic conditions, the cofferdams were launched by the air bag method, floated to the pier sites and accurately positioned there by heavy anchors without the aid of guiding barges. The cofferdams were then set on the piles, the bracing trusses inside the cofferdams were concurrently used as the boring platforms and the cofferdams were extended in height. In the controllable state that the gravity was greater than the buoyancy, the construction schemes for lowering the integral cofferdams down to the riverbed, sinking the cofferdams into the riverbed and the second time positioning and setting the cofferdams on the piles were well realized. This paper mainly deals with the key techniques for construction of the foundations, inclu- ding those of launching the integral huge cofferdams by the air bag method and by cutting anchor ropes, accurately positioning the cofferdams by heavy anchors without the aid of guiding barges, lowing, landing on riverbed and sinking control of the cofferdams.
作者 宋伟俊
出处 《桥梁建设》 EI CSCD 北大核心 2009年第2期1-4,8,共5页 Bridge Construction
关键词 桥梁基础 深水基础 围堰 施工方法 bridge foundation deep water foundation cofferdam construction method
  • 相关文献

参考文献1

同被引文献104

引证文献25

二级引证文献178

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部