摘要
A project of jointly establishing 300,000-tonnage crude oil dock of Tianjin Port has been put into operations,thanks to its output grid successfully connected with oil pipeline of Sinopec Tanggu reservoir.The project
A project of jointly establishing 300,000- tonnage crude oil dock of Tianjin Port has been put into operations, thanks to its output grid successfully connected with oil pipeline of Sinopec Tanggu reservoir.