摘要
结合银武国道主干线湖北省境十堰至漫川关高速公路梁场设置实例,介绍了两种预制梁场的设置方案,并对这两种方案进行技术经济比选。
Combined with the expressway prefabricate girder yard of Yin-Wu main line in Hubei, two schedules of prefabricate girder yard have been introduced. We have made a technical and economical comparison of these two schedules.
出处
《铁道建筑技术》
2009年第4期86-88,共3页
Railway Construction Technology
关键词
预制梁场
设置方案
对比分析
prefabricate girder yard
setting schedule
comparison and analyse