摘要
分析和预测京南电站在旺村电站蓄水后由于尾水位的提高,对发电运行及水工建筑、金结设备的检修维护产生的影响。
The article studies and estimates how the rise of tail water level after impoundment of Wangcun Power Station affects power generation operation as well as maintenance of hydraulic structure and metal equipment of Jingnan Power Station.
出处
《红水河》
2009年第2期94-97,共4页
Hongshui River
关键词
蓄水
尾水位
发电运行
检修维护
京南电站
旺村电站
impoundment
tail water level
power generation operation
repair and maintenance
Jingnan Power Station
Wangcun Power Station