摘要
以广东岭澳核电站二期工程为例,介绍了人工挖孔桩施工中应注意的事项及安全管理经验。桩基检测结果表明,单桩竖向及水平承载力均满足设计要求。
Taking the Phase Ⅱ construction of Ling'ao Nuclear Power Station(LNPS) in Guangdong Provinceas a example, watchful items and safe manage experience are introduced in the operation of artificial hole digging pile. The results from monitor of Foundation Piles show that the horizontal bearing capacity and the vertical bearing capacity both meet the demand of design.
出处
《土工基础》
2009年第2期15-17,53,共4页
Soil Engineering and Foundation
关键词
人工挖孔桩
安全管理
桩基检测
artificial hole digging pile, safe manage, monitor of foundation piles