输水渠道大流量分水口门的分级分水方式 被引量:8

Multi-stage Diversion Modes for Large Flow Dividing Gates in Water Transportation Channel
下载PDF
导出
摘要 本文以南水北调中线工程典型分水口为研究对象,采用一维非恒定流模型对不同分水口运行方式进行计算分析,研究渠道相应的水力响应现象,包括水位升高降落幅度、速率及其影响范围,建立了分水口分水比与水面线的相关关系,提出了分水口分级分水的运行方式.针对设计分水流量占渠道设计输水流量50%的西黑山分水口,计算认为:1h内一次分水流量增加最好不大于16m3/s,二次分水流量增加总量最好不大于20m3/s,将2次分水延长到2h内完成,能够较好控制水位下降速度,从而减小对渠道安全的影响. Taking the typical dividing gates of South-North Water Transfer Midline Project as a research object, this paper calculates and analyzes the operation modes of different flow dividing gates with one dimension unsteady flow model. The corresponding hydraulic response, including the changing magnitude, velocity, and the influencing range of water level is studied, the correlation of the water diversion rate and the water surface profile is established, and the multi-stage operation mode of water diversion is proposed. Take the Gate Xiheishan, whose designed water diversion discharge is half of the designed discharge of the channel, as an example, it is recommended that, in 1 hour, the increment of dividing flow should be less than 16m^3/s by once and 20m^3/s by twice. Nevertheless, the decreasing velocity of water level would be better controlled and the influence to channel would be less if the water diversion operation by second time is accomplished in 2 hours.
出处 《应用基础与工程科学学报》 EI CSCD 2009年第2期161-171,共11页 Journal of Basic Science and Engineering
基金 国家自然科学创新研究群体科学基金资助项目(50221903)
关键词 分水口 南水北调 分级分水 水力响应 flow dividing gates South-North Water Transfer Project water diversion under multi-stage mode hydraulic response
  • 相关文献

参考文献13

  • 1Leslie Skertchly Molina, Miles J P. Control of an irrigation canal[ J]. Journal of Hydraulic Engineering, 1996,122 (7) : 403-410
  • 2Ruiz-Cannona V M, Clemmens A J, Schuurmans J. Canal control algorithm formulations [J].Journal of Irrigation and Drainage Engineering, 1998,124 ( 1 ) :31-39
  • 3David C Rogers,Jean Goussard. Canal control algorithms currently in use[J]. Journal of Irrigation and Drainage Engineering, 1998,124(1) :11-15
  • 4范杰,王长德,管光华,崔巍.美国中亚利桑那调水工程自动化运行控制系统[J].人民长江,2006,37(2):4-5. 被引量:3
  • 5David C Rogers, Timothy F Kacerek,Robert S Gooch. Field data for verifying canal unsteady flow models[ J]. Journal of Irrigation and Drainage Engineering,1993,119(4) :679-692
  • 6Forrest M Holiy Jr, Gary P Merkley. Unique problems in modeling irrigation canals [ J]. Journal of Irrigation and Drainage Engineering,1993,119(4) :656-662
  • 7范杰,王长德,管光华,崔巍.渠道非恒定流水力学响应研究[J].水科学进展,2006,17(1):55-60. 被引量:38
  • 8王银堂,胡四一,周全林,文丹,王方清,吴泽宇.南水北调中线工程水量优化调度研究[J].水科学进展,2001,12(1):72-80. 被引量:29
  • 9畅建霞,黄强,王义民,杨房廷.南水北调中线工程水量仿真调度模型研究[J].水利学报,2002,33(12):85-90. 被引量:16
  • 10长江水利委员会长江勘测规划设计研究院.南水北调中线一期工程可行性研究总报告[R].武汉:长江勘测规划设计研究院,2005.

二级参考文献12

  • 1龙子泉,白宪台.抽水灌溉系统站库联合优化调度数学模型[J].水科学进展,1993,4(2):106-112. 被引量:3
  • 2张尚弘,王兴奎,唐立模,张红林.南水北调中线工程节制闸间距研究[J].应用基础与工程科学学报,2001,9(4):354-359. 被引量:11
  • 3张尚弘,赵刚,宋博,王兴奎.南水北调中线工程三维仿真系统开发[J].南水北调与水利科技,2007,5(2):31-35. 被引量:14
  • 4郭元裕 白宪台 等.湖北四湖地区除涝排水系统规划的大系统优化模型和求解方法[J].水利学报,1984,(11):1-14.
  • 5William W- G, Leonard Becker, Douglas Toy. Central Arizona Project:Operations Model. Journal of the Water Resources Planning and Management Division, 1980, (7).
  • 6Pierre 0 M, David C R, Jan S. Classification of Canal Control Algarithms[J]. Jonrnal of Irrigation and drainage engineering, 1998, 1:2-5.
  • 7长江水利委员会,南水北调中线工程论证报告及附件,1995年
  • 8华士乾,水资源系统分析指南,1988年
  • 9郭元裕,水利学报,1984年,11期,1页
  • 10徐正凡.水力学[M].北京:高等教育出版社,1986.255-366.

共引文献187

同被引文献70

引证文献8

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部