鞍钢鲅鱼圈钢渣热闷处理工程的EPC总承包项目管理实践 被引量:5

THE EPC GENERAL CONTRACT MANAGEMENT PRACTICE OF BAYUQUAN PROJECT OF STEEL SLAG HEAT-STUFFING TREATMENT UNDER ANSHAN IRON AND STEEL COMPANY
原文传递
导出
摘要 鞍钢鲅鱼圈80万t/a钢渣热闷处理生产线是环保示范工程项目,采用了目前国际上流行的EPC工程管理模式进行投资建设。中国京冶工程技术有限公司作为该项目的EPC总承包商,充分发挥了设计在工程总承包中的主导作用,运用成熟的EPC总承包项目管理经验成功完成了该项目的承建。对鞍钢鲅鱼圈钢渣热闷处理工程的EPC总承包项目管理实践进行了详细的论述。 Bayuquan steel slag heat-stuffing treatment line (8 x 10^5 t/a) of Anshan Iron and Steel Company is a model project of environmental protection, which is invested and constructed with EPC project management model that is currently a popular international project management model. As the EPC general contractor, China Jingye Engineering Co., Ltd fully plays a leading role of the design in general contract and uses mature EPC management experience which attains a successful completion of the project's construction. In this paper, the EPC project management practice of Bayuquan project is described in detail.
作者 高虹 李可
出处 《环境工程》 CAS CSCD 北大核心 2009年第2期94-96,共3页 Environmental Engineering
关键词 EPC总承包 项目管理 实践 EPC general contract project management practice
  • 相关文献

参考文献2

  • 1徐建彬.GBIT50358-2005建设项目工程总承包管理规范[S].
  • 2中国建筑协会工程项目管理委员会.工程总承包项目管理实务指南[M].北京:中国建筑工业出版社,2003.

共引文献1

同被引文献62

引证文献5

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部