摘要
湖北超高压输变电公司所属变电站遭遇的近50年来最为严重的降温降雪天气,针对变电设备异常及缺陷进行了分析,指出了还存在的问题,并提出了完善和改进的办法。
The substation of HBEPC EHV Transmission & Substation Company encountered the most serious ice disaster with rain and snow weather in the last 50 years. We focused on analyzing substation equipment the unusual and defective, pointed out the problem still existing and proposed the method of perfection and improvement.
出处
《湖北电力》
2009年第2期16-17,共2页
Hubei Electric Power
关键词
变电站
冰灾
设备缺陷
保电
substation
ice disaster
equipment defect
ensure the normal operation of power grids