摘要
新建火电机组完成168 h的后续试验是关系机组和电网安全稳定运行的重要环节,介绍了机组的启动验收性能试验和并网安全性评价要求的各项试验,对完成各项试验任务提出要求。
The subsequent tests after 168 h test run are important parts to new thermal power unit for they relate to safety and stability of unit and the electric network in operation. The paper introduces the start-up acceptance of the unit and the tests for security evaluation requirement of power grid synchronization, and puts forward the concrete requirements for achieving each testing task as well.
出处
《湖北电力》
2009年第2期47-48,共2页
Hubei Electric Power
关键词
火电机组
性能试验
安全性评价
试验
thermal power unit
performance test
security evaluation
test