1ST Ng, TM Rose, M Mak, SE Chen, Problematic issues associated with project partnering--the contractor perspective [ J ]. International Journal of Project Management, 2002, 20 (6) : 437- 449
2PED Love, Z Irani, DJ Edwards. A seamless supply chain management model for construction [ J]. Supply Chain Management: An International Journal, 2004, 9 (1): 43 - 56
5Ballard, G.. Construction-One Type of Project Production System [R]. 13th Annual Conference of the International Group for Lean Construction, Sydney, Australia, July 2005 : 29 - 36
6KoskelaL. Application of the New Production Philosophy to Construction (Teeh. RePort72) [R]. CIFE: Stanford Univ., CA, 1992
7William J. O'Bfien, Kerry London and Ruben Vrijhoef. Construction supply chain modeling: a reseach review and interdisciplinary research agenda [R]. Proceedings IGLC- 10, Gramado, Brazil, 2002, 8: 129-149
8Ruben Vfijhoef, Laud Koskela. Tile four roles of supply chain management in construction [J]. European Join-hal of Purchasing & Supply Management, 2000, (6) : 169-178
9Carliss Y. Baldwin.设计规则:模块化的力量[M].张传良译.中信出版社,2006:79
2Eppinger S D,Whitney D E,Smith R P. A modelbased method for organizing tasks in product development[J]. Research in Engineering Design,1994, (6): 1 ~ 13.
3Browning T R. Applying the DSM to system decomposition and integration problems:a review and new directions [ J]. Engineering Management,2001,48 (3): 292~ 306.
4Eppinger S D. Model-based approaches to managing concurrent engineering[J]. Journal of Engineering Design, 1991,2(3) :283~290.
5Yassine A, Falkenburg D, Chelst K. Engineering design management: an information structure approach[J]. International Journal of Production Research, 1999,37 (13): 2957~ 2975.
4Levchuk G M, Levchuk Y N, Luo J, et al. Normative Design of Organizations-Part I: Mission PLanning [ J ].IEEE Transac- tions on Systems, Man, and Cybernetics-Part A: Systems And Humans, 2002,32( 3 ) : 346.
5Hillson D. Using a risk breakdown structure in project management [J]. Journal of Facilities Management, 2003,2 (1) : 85- 97.
6Tseng C P, et al. Risk control allocation model for pressure vessels and piping project [J]. Journal of Vibration and Control, 2012,18(3) : 385-394.
7Eppinger S D, et al. A model-based method for organizing tasks in product development [J].Research in Engineering Design, 1994,6 (1) : 1- 13.
8Project Management Institute. A guide to the project management body of knowledge (PMBOK Cguide )-Fifth edition [M]. Newtown Square: Project Management Institute, Inc, 2013 : 309.
9Rafele C, Hillson D, Grimaldi S. Understanding project risk exposure using the two-dimensional risk break-down matrix [ C] // 2005 PMI Global Congress Proceedings. Newtown Square: PMI, 2005.
10Warfield J N. Binary matrices in system modeling [J]. Systems, Man and Cybernetics, IEEE Transac- tions on,1973, (5) :441-449.