摘要 针对某220 kV变电站信号漏报的现象,进行了大量的模拟试验,还原信号漏报的整个过程,通过各种不同方法的比较,借助高精度试验设备,找出信号漏报的原因是测控装置防抖时限设置错误。在对防抖时限设置做出准确修改后,再反复多次模拟该信号漏报的操作过程,无一漏报或误报,确保了信号的正确性。 Aiming at a signal omitted occurred in a 220 kV substation, a lot of simulation tests to restore the signal omitted process have been done. By comparative analysis and high-precision test equipment, the reason has been found. It is false setting for eliminating dither. After modifying the setting, the process of signal omitted was simulated for several times. The modified time slot was proved to be available for ensuring signal correct with no omitted or fault.
出处 《浙江电力》 2009年第2期75-77,共3页 Zhejiang Electric Power
关键词 变电站 信号 漏报 抖动 substaton signal omit dither
  • 相关文献

参考文献2

  • 1浙江创维自动化工程有限公司.REC561测控保护装置功能说明书[G].
  • 2王兆安,黄俊.电力电子技术[M].北京:机械工业出版社,1994.

同被引文献29

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部