高面板堆石坝大坝填筑设计与施工 被引量:9

Design and Construction of Dam Filling of High CFRD
下载PDF
导出
摘要 面板堆石坝在我国发展得很快,目前我国已建成了一批坝高超过150m的高面板堆石坝,在建的水布垭大坝更是高达233m。然而我国现有的面板坝设计施工规范,对坝高超过200m的高坝并无具体指导性意见。结合国内外在建的水布垭(233m)和巴贡(205m)高面板堆石坝的设计与施工,从大坝体形、堆石分区、堆石料级配设计与施工质量控制等方面进行分析,从侧面验证了未来300m级高面板堆石坝的可行性。 The development of CFRDs is very fast in China. At present, a lot of CFRDs with the height of more than 150 m have been built, and some others remain under construction, one of which is Shuibuya Project with the height of 233 m. However, the prevailing specifications for CFRDs in China has no detailed guidelines for the dams over 200 m. Based on the construction of Shuibuya Dam (233 m) and Bakun Dam (205 m), this paper illustrates the design of dam profile, zoning and grading of rock-fills, and quahty control of high CFRDs" construction, which verify the predict that CFRD with the height of more than 300 m is practicable.
作者 刘先行
出处 《水力发电》 北大核心 2009年第3期44-46,80,共4页 Water Power
关键词 面板堆石坝 设计 施工 水布垭工程 巴贡工程 CFRD design construction Shuibuya Project Bakun Project
  • 相关文献

参考文献7

  • 1DL/T5016-1999.混凝土面板堆石坝设计规范[S].[S].,2000..
  • 2Bayardo Materon, Rui T. Mori. Concrete Face Rockfill Dams Construction Features[A]. J. B. Cooke Volume[C].2000.
  • 3《水布垭面板堆石坝前期关键技术研究》编写委员会.水布垭面板堆石坝前期关键技术研究[M].北京:中国水利水电出版社,2005..
  • 4Bakun Hydroelectric Project. Embankment and Rockfilling[S]. 2004(unpublished).
  • 5Cao Keming, etc. Discussion "The Upstream Zone in Concrete- Face Rockfill Dams"[J], Journal of Geotechnical Engineering,ASCE,1987,113(10) : 1234-1236.
  • 6杨启贵,熊泽斌.水布垭面板堆石坝设计与新技术应用[A].中国混凝土面板堆石坝加年[C].2005.
  • 7曹茂林,周俊方,彭道.水布垭面板堆石坝填筑施工技术[A].中国混凝土面板堆石坝20年[C].2005.

共引文献20

同被引文献25

引证文献9

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部