印度“东气西输”工程管线施工自动焊焊接工艺 被引量:1

Automatic Welding Procedure in Pipeline Construction of India East to West Gas Project
下载PDF
导出
摘要 介绍了印度"东气西输"天然气管道工程焊接技术规范,针对管径1219mm、壁厚17.2mm的X70级管线,推行了NOREAST内焊机根焊+PAW2000型外焊机填充盖面和CRC内焊机根焊+CRCP260焊机热焊+CRCP600双焊炬填充盖面两种自动焊组合方案。实际施工应用表明,两种焊接组合焊接接头检验结果均满足相关规范要求,但各有其不同特点及适用性。 This article introduced welding technology specification of India East to West Gas Pipeline Project. With regard to 17.2 mm thickness,48in pipe diameter and X70 grade pipeline,it introduced 2 kinds of combination methods for automatic welding, one is NOREAST inside welding machine root welding + PAW -2000 outside welding machine filled in and cover,the other is CRC inside welding machine root welding + CRC P260 welding machine heat welding + CRC P600 double welding torch filled in and cover. Construction practice proved that weld jointer test results by adopting these two kinds of welding combination can both meet the corresponding specification requirements ,but these two methods have their different characteristics and applicability.
出处 《焊管》 2009年第4期57-60,64,共5页 Welded Pipe and Tube
关键词 印度“东气西输” 焊接技术规范 自动焊 焊接工艺 India East to West Gas Pipeline Project welding technology specification automatic welding welding procedure
  • 相关文献

参考文献2

  • 1Reliance EWP100 - P30 - J00 - 505, Specification for Pipeline Welding[S].
  • 2API 1104-2005,Welding of Pipelines and Related Facilities[S].

同被引文献1

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部