基于Java多线程技术的项目进度并行仿真研究 被引量:1

Project Schedule Parrallel Simulation Based on Java Multithreading Technology
下载PDF
导出
摘要 利用系统仿真的思想,对项目中的工序进行建模,通过计算得到工期的估计。根据Monte Carlo仿真原理,基于Java多线程技术,利用网格计算集群对一个算例进行并行仿真。研究结果以及时间统计表明,该方法不仅可以计算出工期进度概率分布,明确关键路径,而且可以缩短仿真时间,提高效率。 The theory of system simulation is used to calculate an estimation of project's completion period, based on which the project procedures are modeled. The key approach is to use Monte Carlo simulation. With the power of Java multithreading technique, a parallel grid calculation is applied to simulate an example and optimize it. Computing result and time record show that, not only this approach can work out the project schedule estimation with distribution and a certain critical path, but also shorten the simulation time and increase the efficiency.
出处 《航空制造技术》 2009年第9期84-87,共4页 Aeronautical Manufacturing Technology
基金 国家自然科学基金课题(70671007) 教育部博士点基金课题(200800060005)资助
关键词 JAVA多线程 并行仿真 项目进度计算 MONTE Carlo仿真 Java multithreading Parallel sim-ulation Project schedule calculation Monte Carlosimulation
  • 相关文献

参考文献2

二级参考文献20

  • 1Foster I, Kesselman C, Nick J, et al. The physiology of the grid: an open grid services architecture for distributed systems integration [ EB/OL]. http:∥www. globus.org/research/papers/ogsa. pdf. January, 2002
  • 2Bo Hu Li, Xudong Chai, Guangleng Xiong, et al.Research and application on virtual prototyping engineering for complex product [A]. The Proceedings of the Summer Computer Simulation Conference [ C].2002: Session 4. 12~ 19
  • 3Bo Hu-Li, Xu Dong-Chai, Chun Lai-Quan, et al.Research on tools suit for collaborative virtual prototyping engineering [ A ]. Proc. of EUROSIM 2001 [C]. Editors: Arnold Heemink, Leu Dekker, et al., Delft, the Netherlands, 2001: No. 167. 1~7
  • 4IMTI, Inc., Integrated Manufacturing TechnologyRoadmapping, Project, 2000
  • 5十五863/CIMS主题专家组.十五863/CIMS主题计划[Z].,2001..
  • 6Danny J.Johnson. A spreadsheet method for calculating work completion time probability distributions of paced or linked assembly lines[J]. International Journal of Production Research, 2002, 40(5): 1131--1153.
  • 7S M T Fatemi Ghomi, E. Teimouri. Path critical index and activity critical index in PERT networks[J]. European Journal of Operational Research, 2002, 141(1): 147-152.
  • 8Premachandra I M.An approximation of the activity duration distribution in PERT[J]. Computers & Operations Research, 2001, 28(5): 443-452.
  • 9Williams T M. Practical use of distributions in network analysis [J ]. Journal of Operation Research Society, 1992 (3):265-270.
  • 10ICK-HYUN NAM. Dynamic schedule for a flexible processing network[J]. Operations Research, 2001, 49(2):305 -315.

共引文献38

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部