摘要
结合工程实例,介绍了在湿陷性黄土场地里采用灰土挤密桩+水泥粉煤灰碎石桩(CFG桩)二元复合地基对高层建筑地基处理的效果。
Connecting with the engineering example, this paper introduces the effects of the treatment of high-rise building' s foundation in the collapsible loess site with the binary pile composite subgrade of lime-soil compaction pile + CGF pile.
出处
《科技情报开发与经济》
2009年第11期224-225,共2页
Sci-Tech Information Development & Economy
关键词
灰土挤密桩
CFG桩
湿陷性黄土
地基处理
lime-soil compaction pile
CGF pile
collapsible loess
foundation treatment