摘要
桃墅岭隧道右线出口严重偏压,重点介绍在施工中采取的进洞措施,通过对比原设计方案与实际施工方案和通过现场的监控量测,论证该方案的可行性,为今后处理偏压进洞提供典范。
There is serious bias pressure in right line exist of Taoshuling tunnel. The paper introduced the tunneling measure compared to the original design scheme and demonstrated the feasibility of the former with the model provided to bias pressure tunneling.
出处
《探矿工程(岩土钻掘工程)》
2009年第4期76-78,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
桃墅岭隧道
出口偏压
进洞方案
tunnel
bias pressure of tunnel exist
tunneling scheme
Taoshuling tunnel