一种求解资源受限项目调度问题的遗传算法 被引量:2

A Genetic Algorithm for Solving RCPSP
下载PDF
导出
摘要 提出一种求解使用可更新资源的单模式资源受限项目调度问题的遗传算法.采用遗传算法对项目活动进行调度,在满足紧前关系约束和资源约束的条件下,最小化项目工期.继承了基于排列和基于优先级的编码方案的优点,提出一种新的基于优先权排列的编码方案.采用串行调度方法生成项目计划.使用PSPLIB中的标准问题库对算法进行了充分的数值实验,通过与既有算法进行比较,证明本文算法的有效性. A genetic algorithm (GA)is proposed to solve the resource constrained project scheduling problem(RCPSP), in which resources are renewable and there is a single mode to perform each activity. Genetic algorithm is employed to schedule project activities to minimize make-span subject to precedence constraints and resources availability. A new permutation of priority-based encoding scheme is designed in the algorithm, and it inherits the merits of both the permutation-based encoding scheme and the priority-based encoding scheme. The serial scheduling scheme is used in decoding scheme to generate project plan. A full computational experiment is set up using the wellknown standard instances library in PSPLIB, and the algorithm presented in this paper is compared with the other existing intelligent optimization algorithms. The experiment results reveal that the algorithm is effective for the RCPSP.
作者 杜焱 彭武良
出处 《沈阳理工大学学报》 CAS 2009年第1期70-73,78,共5页 Journal of Shenyang Ligong University
基金 国家自然科学基金资助项目(60604025)
关键词 遗传算法 项目调度 启发式算法 genetic algorithm project scheduling heuristic algorithm
  • 相关文献

参考文献11

  • 1彭武良,卢睿,刘振.产品设计项目过程管理的研究与实现[J].计算机集成制造系统,2008,14(1):89-95. 被引量:6
  • 2Brucker P, Knust S, Schoo A, et al. A branch and bound algo- rithm for the resource constrained project scheduling problem [ J ]. European Journal of Operational Research, 1998, 107 (2) : 272-288.
  • 3Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling[ J]. Naval Research Logistics, 1995, 45 (7) :733-750.
  • 4Brucker P, Drexl A, Mohring R,et al. pro- ject scheduling: notation, classification, models, and methods [ J]. European Journal of Operational Research, 1999,112( 1 ) : 3-41.
  • 5Rainer Kolisch, Sonke Hartmann. Experimental investigation of heuristics for resource-constrained project scheduling: An Update [ J]. European Journal of Operational Research, 2006,174( 1 ) : 23 -37.
  • 6Kolisch R. Serial and parallel resource-constrainedproject scheduling methods revisited : theory and computation [ J ]. European Journal of Operational Research, 1996, 90(2) : 320-333.
  • 7Kolisch R, Sprecher A. PSPLIB-A project scheduling problem library[ J]. European Journal of the operational search, 1997, 96 ( 1 ) : 205-216.
  • 8Alcaraz J, Maroto C. A robust genetic algorithm for resource allocation in project scheduling [ J ]. Annals of Operation Research, 2001, 102(1) : 83-109.
  • 9Hindi K S, Yang H, Fleszar K. An evolutionary algorithm for resource-constrained project scheduling[J]. IEEE Transactions on Evolutionary Computation, 2002, 6(5) : 512-518.
  • 10Bouleimen K, Lecocq H. A new efficient simulated annealing algofithm for the resource-constrained project scheduling problem and its multiple mode version [ J ]. European Journal of Operational Research, 2003, 149(2) :268-281.

二级参考文献8

共引文献5

同被引文献12

  • 1郑超,高连生.蚁群算法在资源受限项目调度问题中的应用[J].计算机工程与应用,2005,41(27):205-208. 被引量:16
  • 2王巍,赵国杰.粒子群优化在资源受限工程调度问题中的应用[J].哈尔滨工业大学学报,2007,39(4):669-672. 被引量:11
  • 3KOLISCH R, HARTMANN S. Experimental investigation of heuristics for resource-constrained project scheduling: an update[ J]. European Journal of Operational Research,2006,174( 1 ) :23-37.
  • 4PRICE K. An introduction to differential evolution[ M]. New Ideas in Optimization. Maidenhead : McGraw-Hill, 1999:79-108.
  • 5KENNEDY J, EBERHART R. Particle swarm optimization [ C ]// Proc of IEEE International Conference on Neural Networks. 1995: 1942-1948.
  • 6SHI Y, EBERHART R C, EMPIRICAL C. Experimental study of particle swarm optimization [ C ]//Proc of the World Multiconference on Systemics Cybernetics and lnfommtics. 2000 : 1945-1950.
  • 7KELLY J E Jr. The critical path method: resource planning and scheduling[M]//MUSH J F, THOMPSON G L. Industrial Scheduling. Englewood Cliffs : Prentice-Hall, 1963.
  • 8KOLISCH R. Serial and paralled resource-constrained project schedu- ling methods revisited: theory and computation [J]. European dournal of Operational Research, 1996,90 ( 2 ) :320- 333.
  • 9KOLISCH R, HARTMANN S. Experimental investigation of heuristics for resource-constrained project scheduling:an update [J]. European Journal of Operational Research,2006,174(1) : 23-37.
  • 10袁亚湘,孙文瑜.最优化理论与方法[M].北京:科学出版社,2009.

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部