混凝土面板堆石坝潜没式混凝土高趾墙设计 被引量:5

Design of submerged concrete high toe wall of CFRD
下载PDF
导出
摘要 混凝土面板堆石坝的设计中,通常采用混凝土高趾墙的方式来弥补地形、地质条件的缺陷或处理与岸边相邻水工建筑物合理衔接问题。根据黄河公伯峡水电站、新疆察汗乌苏水电站混凝土面板堆石坝高趾墙的设计研究,将这种部分墙体位于库水位以下的混凝土高趾墙称为潜没式高趾墙,同时对潜没式高趾墙的体型设计、稳定应力计算等问题提出一些意见和看法。 In CFRD design, concrete high toe wall is usually adopted to remedy defects of topographical and geological conditions and to connect adjacent hydraulic structures on the bank. Based on the design of concrete high toe wall of CFRD for Gongboxia hydropower station on the Yellow River and Chahanwusu hydropower station in Xinjiang, the concrete high toe wall partially located under the reservoir level is called as submerged high toe wall. The paper puts forward some recommendations on the shape design of submerged high toe wall and stability stress calculation.
作者 安盛勋
出处 《西北水电》 2009年第2期18-21,30,共5页 Northwest Hydropower
关键词 混凝土面板坝 潜没式 高趾墙 设计 CFRD submerged type high toe wall design
  • 相关文献

参考文献8

  • 1DL/T5016-1999,混凝土面板坝设计规范[S].
  • 2SL228-98,混凝土面板坝设计规范[S].
  • 3DL5108-1999.混凝土重力坝设计规范[S].[S].,..
  • 4SL319-2005,混凝土重力坝设计规范[S].
  • 5GB50287-99.水利水电工程地质勘察规范[S].[S].,..
  • 6西北勘测设计研究院.黄河公伯峡水电站枢纽工程技术设计报告[R].西安:西北勘测设计研究院,2007,6.
  • 7西北勘测设计研究院.新疆开都河察汗乌苏水电站可行性研究优化设计报告[R].西安:西北勘测设计研究院,2004,5.
  • 8蒋国澄,赵增凯,孙役,等.中国混凝土面板堆石坝20年[M].北京:中国水利水电出版社,2005.

共引文献357

同被引文献31

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部