摘要 宝钢1号高炉炉顶结构体量大、外形特殊,其大修时采用高位整体拆除、高空滑移与安装的方法进行新旧炉顶结构置换,其抗风稳定性问题是施工成败的关键.根据国内外相关文献对其施工过程中典型位置进行了稳定性计算分析.结果表明,新高炉炉顶结构在10 a重现期的风压下,抗倾覆稳定性可以满足要求. The top structure of blast furnace No 1 in Baosteel is large in size and particular in appearance. In its general overhauling, the high-level integral dismantlement and high-altitude slip and erection are adopted to substitute a new top for the old one, in which the wind stability is the key to the success or failure of the construction. Based on domestic and foreign relevant data, this paper carries out stability analyses on the typical positions in the consturction. The results show that, under the wind pressure of 10-year return period, the anti-overturn stability of the new top structure will answer the needs.
作者 周梅
出处 《徐州建筑职业技术学院学报》 2009年第1期51-54,共4页 Journal of XUZHOU Institute of Architectural Technology
关键词 高炉 风荷载 风振系数 抗倾覆稳定性 blast furnace wind load coefficient of wind-induced vibration anti-overturn stability
  • 相关文献

同被引文献8

  • 1唐兵传,许立新.大型高炉短期化大修主体结构施工的策划与实施[J].施工技术,2009,38(S2):304-309. 被引量:2
  • 2郑史雄,弋晓峰,薛尚铃.特大型高炉炉顶系统风荷载试验研究[J].工业建筑,2009,39(S1):633-637. 被引量:1
  • 3.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 4GB50009-2001建筑结构荷载规范(2006版)[s].北京:中国标准出版社,2006.
  • 5GB50144-2008工业建筑可靠性鉴定标准[S].北京:中国计划出版社,2008.
  • 6DG/TJ08-2011-2007钢结构检测与鉴定技术规程[S].上海:同济大学出版社,2007.
  • 7YB9257-96钢结构检测评定及加固技术规程[S].北京:冶金工业出版社,1996.
  • 8JBG135-2006高耸结构设计规范[S].北京:中国建筑工业出版社,2006.

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部