摘要
特大型水电站建设中的环境影响监测有特定的地理、时效、多支流影响、施工期长等不可重现的特殊性。本文以糯扎渡水电站为例,利用多年监测数据,结合实际情况,探讨了监测因子、优化布点等内容。
There are some specialties that cannot be returned on environmental impact monitoring in construction period in large - scale hydropower plant with local geography and time and long construction period. The monitoring indexes and optimizing sites distribution by taking Nuozhadu hydropower plant as a case study are discussed with long- term monitoring data.
出处
《环境科学导刊》
2009年第B06期127-128,共2页
Environmental Science Survey
关键词
特大型水电开发
施工期监测
糯扎渡
large -scale hydropower plant
monitoring in construction period
Nuo zhadu hydropower plant