3Tzeng GH. Compromise solution by MCDM methods:A comparative analysis of VIKOR and TOPSIS[J]. Eur J Operat Res, 2004, 156(2):445-455.
4Lai YJ, Liu TY,Hwang CL. TOPSIS for MODM[J]. Eur J Operat Res,1994,76 (3):486-500.
5Deng H, Yeh CH, Robert JW. Inter-company comparison using modified TOPSIS with objective weights[J]. Comput Operat Res,2000,27(10):963-973.
6Herath G. Incorporating community objectives in improved wetland management: the use of the analytic hierarchy process[J]. J Environ Manag, 2004,70(3):263-273.
7Liberatore MJ,Nydick RL. Wash criteria and the analytic hierarchy process[J]. Comput Operat Res,2004,31(6):889-892.
8Min H,Mitra A,Oswald S. Competitive Benchmarking of Health Care Quality Using the Analytic Hierarchy Process: an Example from Korean Cancer Clinics[J]. Socio-Econom Plan Sci,1997,31(2):147-159.
9Schmadel LD, Zech G. Landolt-Brnstein[M]. Springer-Verlag Heidelberg,1982.432- 446.
10Puccia CJ, Levins R.Qualitative Modeling of Complex Systems[M]. Boston:Harvard University Press,1985.217-298.