摘要
系统介绍了北京阿苏卫垃圾卫生填埋场渗沥液改扩建工程中MBR主要设计内容,阐述了硝化反硝化和MBR工艺在垃圾填埋场渗沥液处理中的应用,经过3个多月的调试,该工艺运行稳定,对CODCr和NH3-N的去除效果良好,满足设计要求。
The contents of MBR design for leachate treatment reconstruction and extension project of Asuwei Waste Sanitary Landfill Site were systematically introduced. Application of nitrification and denitrification process and MBR in leachate treatment in landfill sites were elabrated. Debugging operation of the process was stable after more than three months, the removal effects of CODcr and NH3-N were perfect which met the design requirements.
出处
《环境卫生工程》
2009年第2期38-40,共3页
Environmental Sanitation Engineering
关键词
渗沥液处理
MBR
设计参数
运行参数
处理效果
leachate treatment
membrane biological reactor
design parameter
operational parameter
treatment effect