川渝地区不同条件下钻接替井的工程技术及实例分析 被引量:6

Engineering Techniques to Drill Successive Wells under Different Conditions and Their Example Analyses in Sichuan-Chongqing Region
下载PDF
导出
摘要 介绍了原井眼上部套管开窗侧钻井、同井场移动井位钻井和附近异井场钻井3种钻接替井的方式。分析了罗家16H-1井、新清溪1井、新856井钻接替井的成功实例。结果表明,天然气勘探开发中的重大发现井,一旦出现井控严重失控,且存在井身结构及工程缺陷时,需要打超长的水泥塞封井。裂缝综合地质预测技术是钻接替井的前提,定向钻井是重要的环节,钻水平接替井不仅增加了钻遇高导斜缝的机遇,而且可增大气井产能。 Three ways to drill successive wells are described,including casing sidetracking in an original well, drilling a new hole within the same well site and drilling a hole in an adjacent other well site.The success examples of drilling successive wells,such as Luojia 16H-1,Xinqingxi 1 and Xin 856,are analyzed.The results have indicated that major gas discovery wells need to be closed by a long cement plug if they are heavily out of control and have shortcomings of hole structure and engineering.For drilling a successive well, the comprehensive geological prediction of fractures is a prerequisite,and directional drilling is a key step. Drilling a horizontal successive well can penetrate much more high dip fractures and increase gas production capacity.
出处 《中外能源》 CAS 2009年第5期68-71,共4页 Sino-Global Energy
基金 国家自然科学基金项目(编号:50674077)的资助
关键词 天然气 钻接替井 定向钻井 套管侧钻井 裂缝预测 水平井 natural gas drill successive wells directional drilling casing sidetracking fracture prediction horizontal well
  • 相关文献

参考文献5

二级参考文献15

共引文献87

同被引文献48

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部