浅谈换流站项目建设现场管理 被引量:7

Discussion on Converter Station On-Site Project Management
原文传递
导出
摘要 在直流工程换流站的建设过程中,对施工现场、工程进度、工程质量及环保等工作的有效管理非常重要。建设项目管理的重点在于现场管理的执行力。管理的思路是安全、质量、进度、投资、环保等要素管理的超前策划、提前预控、事后闭环。现场管理的落点在于项目经理,项目经理管理的要点在于主动及时的协调管理,项目团队大局意识是建精品工程的有力保证。 In the process of DC converter station construction, it is very important to have effective management on construction site, schedule, quality, and environmental protection, etc. The key to construction project management is on-site execution; the idea of management is advance planning, early pre-control, and afterwards close-loop on key elements, like safety, quality, schedule, investment, and environment protection, etc. Project manager is the maj or factor of on-site management,who must eye on proaetive and timely coordination. Awareness of team work guarantees a high quality project.
作者 种芝艺 陈力
出处 《电力建设》 2009年第5期85-87,共3页 Electric Power Construction
关键词 换流站 现场管理 执行力 全寿命周期管理 converter station on-site management execution force life cycle management
  • 相关文献

参考文献1

二级参考文献18

共引文献5

同被引文献26

引证文献7

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部