特高压线路铁塔几种组立施工方法 被引量:35

Several UHV Tower Assembly and Erection Methods
原文传递
导出
摘要 1000kV晋东南—南阳—荆门特高压交流试验示范工程输电线路铁塔组立相对500 kV线路铁塔而言,具有高、大、重的特点,其组立施工难度更大。其铁塔型式主要有3种:猫头塔、酒杯塔、干字塔,每种塔型均有相应的特点,在组立施工时不能一概而论。在11标段组塔中采用了几种组塔方法,这几种方法各有特点,可以根据具体情况在特高压线路中加以应用。 Compared to normal 500 kV counterparts, towers used in the 1 000 kV Jindongnan-Nanyang-Jingmen UHV AC Demonstration Line Project are much taller, bigger, and heavier, and more difficult to assemble and erect. There are 3 major types, namely, eat-head-shaped tower, cup- shaped tower, and :1=-shaped towers, each having its own characters, which requires special attention in construction. Several tower assembly and erection methods are used in No.11 bidding section. Each method has its own characters and can be used in UHV lines according to specific circumstances.
出处 《电力建设》 2009年第4期39-43,共5页 Electric Power Construction
关键词 特高压 铁塔 组立方法 UHV steel tower , assembly and erection methods
  • 相关文献

参考文献8

二级参考文献3

  • 1[4]杜庆华,等.材料力学.人民教育出版社,1963
  • 2DL/T5154—2002.架空送电线路杆塔结构设计技术规定[S].[S].,..
  • 3李庆林.凌一朋,郭学闻.铝钢组合式抱杆中心压力试验及分析[A].超高压送变电施工技术信息网第十一届全网大会技术交流论文集[C],2005.10.

共引文献60

同被引文献139

引证文献35

二级引证文献160

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部