摘要
通过吸收、借鉴国外工程技术人员计划管理的方式与经验,结合国内横道图和网络图的方法与优势,提出"状态报告C"进度控制法,应用于空中客车A320系列飞机中国总装线工程中。与国外常用的状态报告进度管理形式相比,"状态报告C"进度控制法增加了月进度计划横道图及上周施工工程量完成情况和预警电子图表。状态报告最好的适用对象是大型多单体的共建项目,尤其对于质量要求高、施工标准高、工期精度高的项目。
Combining with domestic methods and their strengths of bar chart and network chart, and through absorbing foreign plan management experiences as reference, the progress controlling method of "status report C" is put forward, which is used in A320 airbus engineering. Compared with foreign common progress management form of status report, the progress controlling method of "status report C" adds bar chart of monthly progress plan and electronic graph for completion situation of construction quantity last week and early warning. It is also pointed out that the status report is wore suitable for jointly construction with multi-monomer, especially for the project with high quality requirement, construction standards, and period precision.
出处
《施工技术》
CAS
北大核心
2009年第4期110-111,共2页
Construction Technology
关键词
状态报告
横道图
网络图
计划管理
status report
bar chart
network chart
plan management