期刊文献+

基于DBR的生产控制方法研究 被引量:2

Research of Production Control Method Based DBR
下载PDF
导出
摘要 为解决DBR方法在生产控制研究中的局限性,分别对DBR方法中时间缓冲量的确定、瓶颈识别和控制机制进行改进,建立了一套完善的、基于DBR的生产控制方法,使之能够有效地识别制造系统的瓶颈资源,减少生产中不确定性对系统带来的影响,提高生产绩效. To solve the research limitation of DBR in production control, an improvement of DBR method is carried out in time buffer size determination, bottleneck reorganization and control mechanism. Therefore, the establishment of the perfect DBR control method based on DBR can recognize bottleneck in manufacturing system effectively, lessen the effect of uncertainties on system and improve the performance.
出处 《佳木斯大学学报(自然科学版)》 CAS 2009年第2期259-261,共3页 Journal of Jiamusi University:Natural Science Edition
关键词 Drum—Buffer—Rope(DBR)方法 时间缓冲 瓶颈 Drum- Buffer- Rope (DBR) method time buffer bottleneck
  • 相关文献

参考文献8

  • 1V. Danid. R. Guide Jr., Gerald A. Ghiselli. Implementation of Dram - buffer - rope at a Military Rework Depot Engine Works[J]. Production and Inventory Management Journal. 1995, 36(3) : 79 - 83.
  • 2Guide Jr. VDR. Scheduling Using Drum - buffer-rope in a Remanufacturing Environment[J]. Intemational Journal of Production Research 1996,34:101 - 116.
  • 3Guide Jr. VDR. Scheduling with Priority Dispatching Rules and Drum-buffer- rope in a Recoverable Manufacturing System [ J ].International Journal of Production Economics, 1997,53:101 - 116.
  • 4Guide Jr. VDR,Sfivastava R, Kraus ME. Scheduling Policies for Remanufacturing[J]. International Journal of Production Economics, 1997,48:187 - 204.
  • 5Guide Jr. VDR,Srivastava R, Kraus M. Product Structure Complexity and Scheduling of Operations in Recoverable Manufacluring[ J ]. International Journal of Production Research, 1997,35(3): 179 - 199.
  • 6李爱华,尹柳营.DBR技术中确定缓冲大小的模型[J].中国管理科学,1998,6(1):16-20. 被引量:21
  • 7曹振新,张士杰.基于约束理论的制造单元瓶颈分析及对策[J].机械设计与制造,2004(4):109-111. 被引量:34
  • 8郭永辉,钱省三.基于DBR理论的半导体晶圆厂生产作业控制[J].工业工程与管理,2006,11(5):70-75. 被引量:12

二级参考文献14

  • 1尹柳营,第四届全国管理科学和系统科学研讨会论文集,1996年
  • 2尹柳营,中外管理,1993年,6期
  • 3Chu C H,OMEGA Int J Management Sci,16卷
  • 4Duwwayri, Z.; Mollaghasemi, M.. Scheduling setup changes at bottle neck facilities in semiconductor manufacturing. Simulation Conference,9 - 12 Dec. 2001, vol. 2:1208 - 1214.
  • 5谢连升.[D].南京:南京航空航天大学,2003.
  • 6Spencer M S, Cox J F. Master production schedule development in a theory of constraints environment[J]. Production and inventory management journal, 1995, first quarter: 8-14.
  • 7Odrey N G,Green J D. Adrienne Appello. A generalized Petri net modeling approach for the control of re-entrant flow semiconductor wafer fabrication[J]. Robotics and computer integrated manufacturing, 2001, 17:5-11.
  • 8Schrageheim E, Ronen B. Drum-Buffer-Rope shop floor control[J]. Production and Inventory Management Journal, 1990,thirdquarter: 18-22.
  • 9Ronen B. Starr M K. Synchronized manufacturing as in OPT:from practice to theory[J]. Computers industrial engineering ,1990,18(4):585-600.
  • 10Schragenheim E, Ronen B. Buffer management: a diagnostic tool for production control[J]. Production and inventory management journal, 1991, second quarter: 74-79.

共引文献57

同被引文献20

  • 1郭永辉,钱省三.基于鼓-缓冲器-绳子理论的半导体晶圆厂车间层控制[J].计算机集成制造系统,2006,12(1):111-116. 被引量:10
  • 2Shen Miaomiao, Chen Leilei. Study of production bottleneck shiftiness management [C]//Proeeedings of IEEE 2010 International Conference on Emergency Management and Management Sciences. Beijing: IEEE Press, 2010: 226-229.
  • 3Kuo C T, Lim J T, Meerkov S M. Bottlenecks in serial production lines: a system theoretic approach [J]. Mathematical Problems in Engineering, 1996, 2(3) : 233-276.
  • 4Roser C, Nakano M, Tanaka M. Comparison of Bottleneck detection methods for AGV systems [C]//Chick S, Sanchez P J, Ferrin D, et al. The 2003 Winter Simulation Conference USA: [s. n. ], 2003: 1192-1198.
  • 5Lawrence S R, Buss A H. Shifting production bottlenecks: causes, cures, and conundrums [J]. Production and Operations Management, 2009, 3 (1) : 21-37.
  • 6Faget P, Eriksson U, Herrmann F. Applying discrete event simulation and automated bottleneck analysis as an aid to detect running production constraints [C]//Proceedings of the 37th Conference on Winter Simulation. Winter Simulation Conference. Florida, Orlando: [ s. n. ], 2005: 1401-1407.
  • 7Lu Jiansha, Shen Miaomiao, Lan Xiuju. Study of the shifting production bottleneck: possible causes and solutions [C]//Proceedings of IEEE International Conference on Service Operations and Logistics, and Informatics. Shanghai: IEEE Perss, 2006 : 684-688.
  • 8Lu Jiansha, Shen Miaomiao, Lan Xiuju. Study of the shifting production bottleneck: possible causes and solutions [C]//Proceedings of IEEE International Conference on Service Operations and Logistics, and Informatics. Shanghai: Institute of Electrical and Electronics Engineers, 2006: 684-688.
  • 9Shen Miaomiao, Chen Leilei. Production bottleneck shiftirless study [C]//Proceedings of IEEE International Conference on System Science, Engineering Design and Manufacturing Informatization. Yichang: IEEE Press, 2010: 213-216.
  • 10Schragenheim E, Weisenstern A, Schragenheim A. What's Really New in Simplified DBR [C]//TOCI- CO International Conference, Las Vegas, N V. 2006.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部