摘要
介绍了某发电厂2台600MW机组概况,分析1号锅炉分隔屏过热器超温爆管的原因,阐述了所采取的针对性运行调整措施及实施结果。
The tube explosion causes for the division panel superheater of some Power Plant No. 1 boiler are analyzed. Countermeasures adopted for operational adjustment as well as the results are presented.
出处
《锅炉制造》
2009年第3期19-21,25,共4页
Boiler Manufacturing
关键词
超临界
直流锅炉
分隔屏过热器
爆管
supercritical
oncethroughboiler
division panel superheater
tube explosion