技术改造管理是资产全寿命周期管理的组成部分。本方法是在设备技术改造项目管理上,牢固树立"全系统、全寿命、全费用"的管理理念,探索形成技改项目管理的特色:在立项阶段,将项目决策建立在对资产全寿命周期管理成本分析基础上;在项目执行阶段,将项目的技术经济指标、安全指标分解到设备采购、安装调试、安全措施和管理等方面;在项目管理的全过程中以企业信息系统作为管理的手段;项目完成后对项目开展后评价。该方法已在技改项目管理中推广使用,取得良好效果,并为正在开展的资产全寿命周期管理积累经验。
Technical retrofit management is a composing part of asset life cycle management. The LCC-based technical retrofit project management method was proposed which reflects the concept of'" whole system, whole life, and whole cost" for technical retrofit project management. Its features are: in the project establishing stage, the decision is based on the analysis of asset life cycle cost; in the implementing stage, the technical, economic, and security indi- ces are decomposed into equipment purchase, installation and debugging, security measures and management; in the whole process of project management, the management is based on the enterprise information system; post-evaluation will be conducted for the project when it is over. The above method has been already put into application and has gained good effect.
出处
《华东电力》
北大核心
2009年第4期557-561,共5页
East China Electric Power
关键词
全寿命理念
技术改造
项目管理
资产管理
whole life concept
technical retrofit
project management
asset management