摘要
通过2008年年初的南方冰灾中某一工程实例的分析,寻找连续倒塔事故发生的代表性诱因,提出了在设计阶段对敏感因素予以重视的分析,以期降低类似事故发生的几率。
Based on the analysis of tower collapse of an engineering project in the ice disaster happened in early 2008 in the South, the causes of successive tower collapse were studied. It was proposed that some sensitive factors should be paid more attention during the design stage.
出处
《华东电力》
北大核心
2009年第4期626-628,共3页
East China Electric Power
关键词
输电线路
冰雪灾害
连续倒塔原因
应力分析
transmission line
ice and snow disaster
cause of successive tower collapse
stress analysis