2A J Jassen, J H Brunke, Ch R Hesing, et al. Final report of the second internati onal enquiry on reliability of high voltage circuit-breaker failures and defects in service[J]. CIGRE Technical Brochure, 1994, 16 (83): 1-13.
3能源部电力科学研究院开关所. 一九八五--一九八八年全国高压开关事故分析[Z]. 1989.
4M Runde, B Skyberg, et al. Vibration analysis for periodic diagnos tic tes ting of circuit-breakers [A]. High voltage engineering symposium [C]. 22-2 7 August 1999 Conference Publication, 1999, 467: 98-102.
5M Runde, T Aurud, et al. Acoustic diagnosis of high voltage circui t-breakers [J]. IEEE Trans. Power Delivery, 1992, 7: 1306-1314.
6A A Polycarpou, A Soom, et al. Event timing and shape analysis of vibrati on bursts from power circuit breakers [J]. IEEE Trans. Power Delivery, 1996, 1 1: 848-857.
7M L Lai, S Y Park, C C Lin, et al. Mechanical failure detection of circuit breakers[J].IEEE Trans. on Power Delivery, 1988,3:1724-1731.
8V Demjanenko, H Naidu, A Antur, et al.A noninvasive diagnostic ins trument for power circuit breakers[J].IEEE Trans. on Power Delivery, 1992,7( 2):656-663.
9D P Hess, S Y Park, A Antur,M K Tangri, et al. Noninvasive conditi on assessment and event timing for power circuit breakers[J].IEEE Trans. on Power Delivery,1992,7(1):353-360.