柔性资源约束下的大型项目奖惩结构优化 被引量:14

Study on the Bonus-Penalty Structure Optimization of Large-scale Project Based on Flexible Resource-constrained
下载PDF
导出
摘要 在柔性资源约束下,研究拥有多个子项目的大型项目奖惩结构优化问题,并通过提出优化度这一概念,分析资源租金水平对激励优化程度的影响。研究表明,多个奖惩强度的设定能促进奖惩结构的优化,并保证业主收益的最大化;柔性资源约束的引入使项目进度和奖惩结构得到了进一步的优化;资源的租金水平影响着奖惩结构的优化度,租金水平越低,优化度越好,反之则越差。 In this paper, we optimize the bonus-penalty structure of large-scale project on flexible resource-constraint, and propose a parameter of Optimization-Level to analyze the impact about the Hire-Index influences on the degree of the optimization. We find that the optimization of Incentive-Intensity can make the bonus-penalty structure more effective, and the client will gain their maximal benefits. However, the project scheduling and the bonus-penalty structure can be optimized better, because of the flexible resource. The Hire-Index of the resource influences the degree of the optimization very much, and the lower the better, whereas the higher the worse.
出处 《系统管理学报》 北大核心 2009年第2期142-146,152,共6页 Journal of Systems & Management
基金 国家自然科学基金资助项目(70702013) 中国博士后科学基金资助项目(20070421116) 教育部“春晖计划”合作项目(S2007-1-62001)
关键词 大型项目 柔性资源约束 奖惩结构 租金水平 优化度 large-scale project flexible resource-constraint bonus-penalty structure hire-index optimization-level
  • 相关文献

参考文献17

  • 1Serghei Floricel, Roger Miller. Strategizing for anticipated risks and turbulence in large-scale engineering projects[J]. International Journal of Project Management. 2001, 19(11): 445-455.
  • 2Mol Michael J, Pauwels Pieter, Matthyssens Paul, et al. A technological contingency perspective on the depth and scope of international outsourcing [J]. Journal of International Management, 2004, 10 (2): 287-305.
  • 3柴国荣,洪兆富,亓文国.基于进度优化的大型项目激励机制模型[J].系统工程,2008,26(1):102-105. 被引量:10
  • 4Avraham Shrub, Larry J LeBlanc, Ziyong Cai. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm[J]. European Journal of Operational Research, 1996, 88(1):124-138.
  • 5Taeho Ahn, S. Selcuk Erenguc. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure[J]. European Journal of Operational Research, 1998, 107(2): 250-259.
  • 6Konstantin Kogan, Avraham Shtub. Scheduling projects with variable-intensity activities .. The case of dynamic earliness and tardiness costs [J]. European Journal of Operational Research, 1999, 118(1): 65- 80.
  • 7汪应洛,杨耀红.多合同的激励优化与最优工期确定[J].预测,2005,24(2):60-63. 被引量:41
  • 8柴国荣,徐渝,张静文,何正文.多模式柔性资源约束型折现流项目进度问题研究[J].系统工程,2005,23(2):14-18. 被引量:14
  • 9De Reyck B, Herroelen W. The multi-mode resource constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 1999, 119(2): 538-556.
  • 10Brian Talbot. Resource-constrained project schedu ling with time-resource tradeoffs: The non-preemp tive case [J]. Management Science, 1982, 28 (10) 1197-1210.

二级参考文献80

共引文献77

同被引文献207

引证文献14

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部