摘要
简介了高炉煤气余压回收发电装置的流程概要及运行控制方法,展望了今后的发展方向。
This paper has introduced the process and operating control method of power generating unit with pressure recovery of blast furnace gas and given its developing direction.
出处
《风机技术》
2009年第2期57-59,共3页
Chinese Journal of Turbomachinery
关键词
膨胀透平
发电装置
expansion turbine
power generating unit