福州站高架候车室工程是在福州火车站不停电不停运的情况下施工的,接触网安全防护问题尤为重要,本文就接触网附近施工的安全防护方法作阐述。
The project of overhead waiting - room in Fuzhou city' s railway station , it is contructed under the condition that do not stop electrical power and do not stop transport at the railway station of Fuzhou, it is particularly important to the safe protection question of the contact network, this text introduces the safe protection method for constructing in the adjacent place of contact network.
出处
《福建建筑》
2009年第4期51-52,63,共3页
Fujian Architecture & Construction
关键词
接触网
安全
防护