摘要
无砟轨道施工工装设备配备影响无砟轨道的施工进度和机械成本,本文重点介绍了无砟轨道施工机械化和半机械化工装设备的配备及生产能力,并对其物流组织进行了简要探讨。
The non--fragments track construction work clothes equipment equipment affected the non-fragments track's construction progress and the mechanical cost, this article introduced with emphasis the non-fragments track construction mechanization and the semimechanized work clothes equipment's equipment and productivity, and has carried on the brief discussion to its physical distribution organization.
出处
《科技创新导报》
2009年第10期63-65,共3页
Science and Technology Innovation Herald
关键词
无砟轨道
工装设备
物流组织
生产能力
Non-fragments track
Work clothes equipment
Physical distribution organization
Productivity