浅谈设计阶段的造价控制

Comments on cost control during design period
下载PDF
导出
摘要 对于建设工程造价的控制主要是在建设项目实施阶段,人们普遍忽视设计阶段的造价管理。论文主要结合西安华城万象二期工程3#高层住宅楼桩基础工程的设计阶段通过与设计院的沟通,对桩基础设计进行经济性及承载力分析、比较,调整、优化图纸,从而控制成本,来说明建设前期对于设计阶段的管理是控制工程造价的关键所在。 For a long time, for the construction project cost control mainly in the construction phase of the project, it is generally ignored pre - construction costs of the design stage management. In this paper, I combine in Xi'an City, Vientiane, the second phase project of China 3# high - rise building pile foundation design stage through to communicate with the design institute, piling on the basis of design and economic analysis of capacity, compared to adjust and optimize the drawings, which Control costs, to illustrate the design for pre - construction phase of the project cost control management is the key.
作者 米永刚
出处 《煤炭工程》 北大核心 2009年第5期108-110,共3页 Coal Engineering
关键词 造价控制 设计阶段 优化图纸 loess cost control design optimization drawings
  • 相关文献

参考文献3

  • 1龚维利,郝丽萍,路君平.工程造价确定与控制[M].北京:中国计划出版社,2003.
  • 2JGJ94-94,建筑桩基技术规范[s].北京:中国建筑工业出版社,1995.
  • 3GB50025-2004,湿陷性黄土地区建筑规范[s].北京:中国建筑工业出版社,2004.

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部