摘要
对斜管沉淀池施工中所遇到的橡胶止水带施工、配水花墙施工等难题进行分析,提出了解决措施。实践证明,这些措施较好地解决了上述难题。
Abstract: Some difficult problems in the construction of sedimentation tank with declined tublar package such as the installation of rubber sealing and build up of water distribution wall are discussed and measures to solve these problems are proposed.
出处
《给水排水》
CSCD
北大核心
1998年第1期59-60,共2页
Water & Wastewater Engineering