摘要 岳阳市南津港污水处理厂一期工程采用前置缺氧/好氧脱氮工艺,出水总磷一直难以达标。一年来,在不新增构筑物的情况下,通过改变缺氧池内溶解氧的含量、调整曝气池污泥浓度及回流比、加大剩余污泥的排放量等工艺参数,将原缺氧/好氧脱氮工艺改造为厌氧/好氧除磷工艺,从而使出水TP≤1.5mg/L,NH3-N≤5.0mg/L,达到《城镇污水处理厂污染物排放标准》(GB18918-2002)的一级B标准。 Pre-Anoxic/Aerobic nitrogen removal process is used in the first phase project of Nanjinggang wastewater treatment plant in Yueyang city, the effluent phosphorus was not able to reach the discharge standards. In the past one year, under the condition of not adding new structure,the original Noxic/Aerobic nitrogen removal process was reconstructed to Anaerobic/Aerobic phosphorus removal process by changing the concentration of dissolved oxygen in the Anoxic tank;reducing mixed liquor suspended solids and sludge return ratio in the areation tank; adding the volume of surplus sludge.The effluent NH3-N and TP is less than and equal to 5.0 mg/L and 1.5 mg/L, meeting the class I-B criteria Specified in Discharge Standards of Pollutants for Municipal Wastewater Plant (GB18918-2002).
作者 蔡勋平
出处 《企业技术开发》 2009年第4期94-96,共3页 Technological Development of Enterprise
关键词 污水处理厂 A/O工艺 改造实践 wastewater treatment plant A/O process reconstruction practice
  • 相关文献

参考文献1

二级参考文献2

共引文献9

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部