期刊文献+

地铁隧道旁通道冻结法施工监测分析 被引量:19

Monitoring Analysis of Construction for Connecting Aisle in Metro Tunnel with Freezing Method
下载PDF
导出
摘要 研究目的:在城市隧道施工过程中,地表变形的大小往往成为决定施工成败的关键因素之一。通过对地表变形、冻胀压力、卸压孔压力等进行监测分析,合理设定冻结参数,减小地表变形,保证施工质量。研究结论:以上海轨道交通10号线2标段旁通道冻结法施工为例,对地表变形、冻胀压力、卸压孔压力等方面进行了跟踪监测;并对监测结果进行分析研究。分析和监测数据验证,合理设定冻结时间、冻胀压力等参数,建立有效的土压平衡,即可将各项变形控制在规定的范围内。 Research purposes:The deformation of the ground surface is essential to the successful construction of tunnel in city.The freezing parameters should be decided rationally through making analysis of the deformation of the ground surface,the expanding and releasing pressures for the purposes of establishing effective soil pressure balance,reducing the deformation of the ground surface,and guaranteeing construction quality.Research conclusions:Taking the connecting aisle construction of bidding 2 of Line 10 of Shanghai metro as an example,the deformation of the ground surface,the expanding and releasing pressures in the soil were monitored on the site and monitored data are analyzed in this paper.The monitored data and analysis results show the deformations can be controlled in the prescribed limit if the parameters of freezing time,expanding pressures are defined rationally and an effective soil pressure balance is established.
出处 《铁道工程学报》 EI 北大核心 2009年第3期93-95,109,共4页 Journal of Railway Engineering Society
关键词 地铁隧道 旁通道 冻结法 监测分析 metro tunnel connecting aisle freezing method monitoring analysis
  • 相关文献

参考文献4

二级参考文献8

共引文献58

同被引文献144

引证文献19

二级引证文献126

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部